Reply To: Build Box at The Humble Barber

Home Forums LUG discussions Build Box at The Humble Barber Reply To: Build Box at The Humble Barber

#21703
Matt Redfield
Participant

    Nope. Thanks for the bump – was meaning to do it.

    I have the box.

    Tom is still awaiting LDD files from which to make instructions, as far as I know.

    Let’s set a target to get those to him by June 14, and get the build box assembled by July 1… that work for yinz guys?

    Are these folks still interested? @bacon1986, @howhardcoulditb, @arcadiumsol, @zaximillian, @tfdesigns, @skippermike

    Online Now

    No members are currently shown as online.