Home › Forums › LUG discussions › Christmas Display: PA Trolley Museum 'Santa Trolley' › Reply To: Christmas Display: PA Trolley Museum 'Santa Trolley'
September 29, 2013 at 10:16 pm
#3480
Why not build single line tracks with loops on the ends? Lego switches allow for trailing point moves, so this is entirely possible. We could add multiple lines beside each other (obviously the “inner” line would be shorter) to give us the benefit of running two trains with minimal supervision (one won’t catch up with the other and ram it). Pardon my horrible Paint skills, but I’ve attached a basic diagram of my proposal.