Reply To: Nov. 9-10. Greenberg Toy and Train Show

Home Forums LUG discussions Nov. 9-10. Greenberg Toy and Train Show Reply To: Nov. 9-10. Greenberg Toy and Train Show

#3866
Tim
Moderator

    - Somebody (Tim maybe?) had mentioned getting to the convention hall early – 3:00ish or so – in order to do as much preparation as possible off to the side before they let us set up the tables at 5. If it helps, I can also plan on showing up at that time (and may anyway in order to avoid traffic).

    – I’ve gotten a lot of work done on my 6 baseplates of layout, and they were specifically designed and fit together to conform to Evan’s plan. I have a double row of train track that’s baseplated and MILSed and I’ve done landscaping and put structures around the tracks based on that plan, so de-plating and de-MILSing is not an option at this point.

    Yes, I am planning on showing up by 3:00 pm on Friday, November 8. We can start getting tables set up, spreading tableclothes, etc. (BTW, has anyone been tasked yet with purchasing white tableclothes? I would recommend buying Queen size flat sheets at Target or Wal-Mart – cheaper than actual tableclothes and provide more coverage).

    Don’t “un-MILS” your track. We can work with it; it is not very difficult to switch between MILS track and non-MILS track. 🙂

    Online Now

    No members are currently shown as online.